09-26-2016, 02:34 PM
I asked this in another thread but maybe someone can help me out if I start a new one:
So I basically have about a quarter inch gap between my drywall and finished tile. I had to cut the drywall to install new backer board and i was left with a gap once the tile was finished.
So my question is, how do I feel this in so its all flush? Can I just fill the hole with joint compound? Do I have to use tape? Im not really joining two pieces of drywall since its being filled up against finished tile...
Any recommendations would be helpful.
So I basically have about a quarter inch gap between my drywall and finished tile. I had to cut the drywall to install new backer board and i was left with a gap once the tile was finished.
So my question is, how do I feel this in so its all flush? Can I just fill the hole with joint compound? Do I have to use tape? Im not really joining two pieces of drywall since its being filled up against finished tile...
Any recommendations would be helpful.
The boys are just talkin' ball, babyyyy